Français
研发1-02.jpg

R&D 

前照灯检测仪.jpg

QUALITY CONTROL TEST

The main test equipment which include as below: headlamp testing, aging test bench, light distribution performance test , salt spray tester, etc.

老化测试台.jpg
灯具配光性能测试系统.jpg
盐雾试验仪.jpg

Aging test bench

Photometric Performance Testing System for Luminaires

Headlamp tester 

Salt spray tester

ASSEMBLY WORKSHOP

 The assembly workshop has 4 lines, 1 packaging line, 26 flexible assembly units and 1 wire harness assembly line, and the capacity is around 35,000 units per day. The time of market orders is 7-10 days, and the lead time of OEM orders is 12-15 days.

样品展示.jpg
模具设计.jpg
产品设计.jpg

SAMPLE DISPLAY

MOULD DESIGN

PRODUCT DESIGN

R&D TECHNOLOGY

We have various technicians in R&D for the lamps, from product appearance design, joint design, Circuit design, injection mold design to hardware mould design. The lead time for the new prototype products can be shorten to 3-5 days and the new moulded products will be delivered within 35 days.

车间布局.jpg
柔性单元.jpg
线束加工区.jpg
总装线体.jpg

WORKSHOP LAYOUT

HARNESS ASSEMBLY AREA

FLEXIBLE ELEMENT

ASSEMBLY LINE BODY

ACCESSORIES WORKSHOP

The accessory workshop has 14 injection molding machines, 26 stamping equipment and 9 machining equipment, which can meet the processing requirements of the main injection moldin, At the same time, it supports the processing and assembly of newly opened internal injection molding and hardware mold parts.

注塑区域.jpg
机加区域.jpg
五金区域.jpg
圆盘立式注塑机.jpg

INJECTION MOLDING AREA

DISC VERTICAL INJECTION

MOLDING MACHINE

HARDWARE AREA

MACHINING AREA

FaceBook
Instagram
WhatsApp